NEW QUESTION 81
A company manufactures automobile engines.
You must create product configurations for values that are used in different types of engines. Each value is based on a master valve design. Different gaskets and fittings are used to allow valves to work with different engines.
You need to translate production plans into Dynamics 365 Finance and Operations elements.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 82
A company manufactures high-end speaker systems. You have different configurations available for customers to customize features including finishes and speaker materials. You have a product configuration model with bill of material lines and conditions for each component.
A customer can optionally add on protective covers, but only if a non-metal material is selected. If any other material is selected, the covers cannot be added. You add the following attributes:
You need to create an expression-based constraint that will only allow Corner Protection if Metal is not selected.
How should you complete the expression? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 83
A company produces lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have been provided the following information for a new relieving lotion.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 84
You are the lead product design engineer at a plastics manufacturing company. You implement a new process that uses a single tool to produce three finished goods at the same time.
You need to set up the planning item number and formula to correctly to manufacture the three items.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Add a coverage group to the formula
  • B. Specify each of the finished good items as co-products
  • C. Add minimum and maximum quantities on formula
  • D. Assign co-products to the formula
  • E. Create item number for planning item and the associated formula

Answer: B,D,E

Explanation:
Section: Create, process, and manage production batch orders

 

NEW QUESTION 85
A company produces paints and assembles bicycle frames.
You must account for paint drying time before assembly operations can begin. You need to set up the operation to encompass queue times.
Which two options can you use? Each correct answer presents part of solution.
NOTE: Each correct selection is worth one point.

  • A. Enter a value in the queue time after field for the painting operation
  • B. Build capabilities for each resource related to color
  • C. Make a resource group for each size and color and assign that group to the operation
  • D. Enter a value in the transit time on the painting operation
  • E. Enter a value in the queue time before field for the assembly operation

Answer: A,E

Explanation:
Section: Set up and configure manufacturing

 

NEW QUESTION 86
You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar.
A machine in the facility is defective and must be closed for repairs for the next two days.
You need to configure the resource calendar to close the resource for production for the next two days.
What should you do?

  • A. Navigate to the resource and select Calendar deviations. Set the calendar to closed for the next two days.
  • B. Navigate to the resource. Change the calendar to closed on the resource.
  • C. Navigate to the calendar used for production and close the next two days.
  • D. Navigate to the resource group. Change the calendar to closed on the resource group.

Answer: A

Explanation:
Section: Set up and configure manufacturing

 

NEW QUESTION 87
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.
Product is sold by the box and priced by the pound.
You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.
Solution: Set up the product as a catch weight item with batch control. Set the catch weight unit to box and the inventory unit to pounds.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
Explanation/Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-catch-weight-items

 

NEW QUESTION 88
You are the production planner for a manufacturing company.
After running operations scheduling for a production order, the following error message displays:

You need to identify the cause of the error.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Review the resource group assigned to Operation 10. Check to see if there is a calendar assigned and if the calendar is expired.
  • B. Review the calendar for the resource to determine if it is expired.
  • C. Navigate to the work calendar and view working times. Validate that there are working days created in the scheduled period.
  • D. Review the available resources for Operation 10. Navigate to the Resource form and validate whether there is a calendar assigned

Answer: B,D

 

NEW QUESTION 89
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Edit the existing step number two activity to be the new engineering process
2.) Edit the existing production flow. Set the expiration date due to the end of the month
3.) Edit the existing Kanban rule. Set the expiration date to the end of the month
4.) Activate the production flow
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

 

NEW QUESTION 90
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.

Answer:

Explanation:

Explanation

 

NEW QUESTION 91
A customer produces light projection toys for holiday decorations throughout the year. Vendors have negotiated rebate agreements as a condition of their contract. The contract also contains the visual templates required for the customer to use in a season.
Vendor rebate agreements must only be applied if the following requirements are met:
* Units of measure for deliverables are the same unit of measure as on the agreement.
* The agreement is valid as of the date a purchase order is generated.
You need to configure the vendor rebate agreements. What should you do?

  • A. Set the Cumulative purchase by field value to the beginning of the season date.
  • B. Set the Calculation date type field value to Created.
  • C. Set the Cumulative purchase by field value to the end of the season date.
  • D. Set the Calculation date type field value to Requested delivery.

Answer: D

 

NEW QUESTION 92
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean process. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
1.) Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01
2.) Create a vendor resource and a work cell for outsourced painting, then add the resource to the work cell
3.) Create a production flow process activity using the painting work cell and the service item as the picking activity
4.) Create a service term on the activity to tie the purchase agreement to the activity Does this solution meet the goal?

  • A. No
  • B. Yes

Answer: B

Explanation:
Section: Create and manage production and lean orders
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/activity- based-subcontracting

 

NEW QUESTION 93
A company sells large batches of chemicals. Item specifications vary from batch to batch.
You must fulfill multiple orders from the same batch of chemicals. If a single batch cannot be reserved, manual reservation must be used. The system must also make reservations based on the earliest batch receipt date.
You need to set up a new chemical item that automatically uses the new batch reservation logic.
Which three settings should you configure? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. In the Item model group, select the FIFO inventory model.
  • B. In the Storage dimension group, select Coverage plan by dimension for the site and warehouse dimensions.
  • C. In the Item model group, select FEFO date-controlled.
  • D. In the Item model group, select Same batch reservation and Consolidate requirements.
  • E. In the Tracking dimension group, select Coverage plan by dimension for batch number.

Answer: A,C,D

 

NEW QUESTION 94
You are a production manager at a company that has implemented lean manufacturing using Dynamics 365 Supply Chain Management.
You have created a new Kanban rule to replace one that is expiring.
You need to determine the impact to the existing process jobs.
How are the active Kanbans of the expired rule handled?

  • A. The active Kanbans are cancelled.
  • B. The active Kanbans are counted as Kanbans of the replaced rule.
  • C. The active Kanban handling units are registered as empty and new Kanbans are created.
  • D. The active Kanbans are set to add to the requested period and distribute for the replacement rule time fence.

Answer: D

 

NEW QUESTION 95
A customer produces light projection toys for holiday decorations throughout the year. The production process creates the projections toy at the following work cells stands, main assembly, electric, visuals, and packaging.
Vendors must create visual templates for the company for each season. They must manage the transfer of visual templates to the warehouse. Each transfer for each vendor must use the same purchase agreement.
You need to configure the subcontracted transfer activity.
What should you do?

  • A. Set the transfer Freighted by value to Shipper. Ensure that purchase agreements include the vendor ID of the vendor.
  • B. Set the transfer Freighted by value to Carrier. Ensure that purchase agreements include the vendor ID of the vendor.
  • C. Set the transfer activity Freighted by value to Shipper. Ensure that purchase agreements include the vendor ID of the warehouse.
  • D. Set the transfer activity Freighted by value to Recipient. Ensure that purchase agreements include the vendor ID of the warehouse.
  • E. Set the transfer activity Freighted by value to Recipient. Ensure that purchase agreements include the vendor ID of the vendor.
  • F. Set the transfer activity Freighted by value to Carrier. Ensure that purchase agreements include the vendor ID of the warehouse.

Answer: D

Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/activity-based

 

NEW QUESTION 96
A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels.
Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration

 

NEW QUESTION 97
A company produces generic and name-brand paper plates in the same factory using standard costing and using the same Bill of materials and routes to produce both products. The finance and production teams want a way to view individual raw material consumption costs in the ledger. You need to add a production group to the finished good to control postings to the ledger. What should you do?

  • A. Update the cost of the generic finished good item.
  • B. Create a production group for the finished good item.
  • C. Create a new Bill of materials with alternate costs for the raw material.
  • D. Create a production pool for the finished good item.

Answer: D

 

NEW QUESTION 98
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Add a new version to the existing production flow. Set the expiration date to the end of the month.
2.) Create an activity for the new process step and add it in the proper sequence
3.) Create a Kanban rule that incorporates the new activity. Set the expiration date to the end of the month.
4.) Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rules as the replacement rule Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
Section: Create and manage production and lean orders

 

NEW QUESTION 99
A company implements Dynamics 365 for Finance and Operations.
Due to increased demand and limited space in the work cell area for product L0050, you must subcontract overflow work to another company. You have the following requirements:
* Locate a supermarket at the subcontractor building.
* Support picking and shipping activity tracking.
* Associate costs of transporting materials between the locations in the cost of the finished product.
You need to modify the production flow.
A company implements Dynamics 365 for Finance and Operations.
Due to increased demand and limited space in the work cell area for product L0050, you must subcontract overflow work to another company. You have the following requirements:
* Locate a supermarket at the subcontractor building.
* Support picking and shipping activity tracking.
* Associate costs of transporting materials between the locations in the cost of the finished product.
You need to modify the production flow.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Create a new production flow version.
  • B. Modify the tumble polish activity and assign it to the subcontractor.
  • C. Create transfer activities and assign thereto the subcontractor.
  • D. Create a resource and work cell resource group for the subcontractor.
  • E. Modify the tumble polish operation and associate it with the subcontractor.

Answer: B,C,E

 

NEW QUESTION 100
A company manufactures and sells speaker boxes. The speaker boxes can be silver or black with a basic or upgraded wiring harness assembly.
The speaker box must be created in the item master so the variables for colors and harness type can be assigned at order entry.
You need to create a new item that supports multiple variables.
What should you do?

  • A. Create a new product master. Select constraint-based configuration as the configuration technology
  • B. Create a new product. Select predefined variant as the configuration technology
  • C. Create a new product master. Select predefined variant as the configuration technology
  • D. Create a new product. Select constraint-based configuration as the configuration technology

Answer: C

Explanation:
Section: Set up and configure manufacturing

 

NEW QUESTION 101
A manufacturing plant uses Lean manufacturing. Operators process Kanban consumption manually by using a mobile device.
The production team must use automatic empty registration for some of the event Kanbans. Registration must occur when the last job of a Kanban is completed.
You need to update the Kanban rule to meet this requirement.
What Kanban setting should you update?

  • A. Select to manually register as empty.
  • B. Select to register as empty when the source requirement is registered.
  • C. Set a fixed Kanban quantity.
  • D. Select to register as empty when handling units are received.

Answer: B

 

NEW QUESTION 102
A company uses Discreet manufacturing concepts to produce cables. The company's production scheduler uses internal documents to track issues on in-process production orders.
The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders.
You need to implement a method to easily identify production orders with issues.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 103
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company.
It is the end of the year and the labor rates have been recalculated based on new salary data.
You need to update the effective labor costs for all labor groups.
Which element must be updated?

  • A. shared category
  • B. resource group
  • C. cost groups
  • D. cost category
  • E. production orders

Answer: D

 

NEW QUESTION 104
A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 105
......


Training Courses for MB-320 Exam

The vendor has two modes of training that you can attend as part of preparing for exam MB-320. One is the free online course and the other is the instructor-led plan:

  • MB-320 Exam Free Online Course

    This free training about MB-320 focuses on five sections or learning paths. Thus, it discusses configuring and using discrete manufacturing, configuring and using process manufacturing, configuring and using lean manufacturing, using warehouse management during manufacturing, and master planning in Dynamics 365 SCM. Each of these learning paths has modules that candidates have to dig into if they have to comprehend what the actual Microsoft MB-320 test requires.

  • Instructor-Led Training Plan

    The MB-320T00-A training course is in English and is a paid option with five modules that take up to 4 days of learning, which targets individuals with intermediate-level skills. One can learn in-person, where the instructor will be providing the learners with the aim and requirements of the course. All in all, the modules cover matters like the configuration of Dynamics 365 SCM, manufacturing, the management of varied manufacturing processes, the execution of master planning targeting production, the implementation of several features of manufacturing, and subcontracting for product-related manufacturing. That is why the right candidates for such a class are those who carry out discovery, capture requirements, engage experts as well as stakeholders about the related subject matter, translate requirements, and configure the needed solutions in addition to applications. During training, learners will also pass through various lessons and lab case studies. By and large, the case studies cover discrete manufacturing, process manufacturing, lean manufacturing, master planning, and subcontracting. Then, the abilities to gain include configuring the most critical and commonly utilized features as well as functionalities in Dynamics 365, processing most transactions in Dynamics 365 Manufacturing, and explaining to others the facets of Dynamics 365 SCM, Manufacturing. Still, before undertaking this course for exam MB-320, there are initial requirements to take care of. They include having basic comprehension for SCM as well as manufacturing terminology and Dynamics 365 Finance as well as Operation apps. Overall, on completing this training, students will gain varying abilities, including:

    • Arranging and managing the module for production control;
    • Configuring and monitoring resources aimed at production processes;
    • Building up discrete manufacturing;
    • Configuring process manufacturing;
    • Operating with lean manufacturing;
    • Managing production orders;
    • Controlling batch orders;
    • Managing kanban orders;
    • Configuring and managing master planning;
    • Planning, scheduling, and performing planning for production capacity;
    • Being in charge of manufacturing execution;
    • Configuring costing policies;
    • Defining models for product configuration with the use of Product Configurator;
    • Configuring subcontracting;
    • Using subcontracting.

 

Pass Your MB-320 Exam Easily - Real MB-320 Practice Dump Updated Nov 26, 2021: https://www.testpassking.com/MB-320-exam-testking-pass.html