[Sep-2022] Oracle 1z0-1075-22 Actual Questions and Braindumps [Q24-Q45]

Share

[Sep-2022] Oracle 1z0-1075-22 Actual Questions and Braindumps

Pass 1z0-1075-22 Exam with Updated 1z0-1075-22 Exam Dumps PDF 2022


Oracle 1z0-1075-22 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe Manufacturing Supervisor Mobile Applications
  • Describe Import Production Transactions
Topic 2
  • Describe Work Definition versions
  • Describe Manufacturing Cloud integrations
  • Report Production Transactions
Topic 3
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Set up Plant Parameters and Security, Profile Options, Lookups and DFFs
Topic 4
  • Execute Basic Transaction and Work Order Reporting
  • Explain Work Execution Work Areas
Topic 5
  • Transfer Production Transactions to Costing
  • Manage Production Calendars and add Shift and Work Center Resource exceptions
Topic 6
  • Describe Managerial Accounting Basics & Cost Accounting
  • Describe how work definition is automatically generated
Topic 7
  • Explain Production Transaction Review and Product Genealogy
  • Configure Resources, Operations, and Work Centers
Topic 8
  • Describe Production Execution transactions (including Outside Processing)
  • Set up common Configuration Elements
Topic 9
  • Explain Common Projects Enabled SCM Configurations
  • Describe Functional Set Up Manager and Simplified Setup

 

NEW QUESTION 24
You have been asked to set up cost estimates for 10 different purchased items. Which two steps could be used to accomplish this task?

  • A. Import spreadsheet.
  • B. Use the Mass Edit functionality.
  • C. Call web service.
  • D. Enter cost estimates directly into UI.
  • E. Run the ESS process "Update Item Cost Estimate".

Answer: A,D

 

NEW QUESTION 25
Identify the three sources from which supply chain orchestration (SCO) can create the work orders.

  • A. Order Management
  • B. Planning
  • C. Quality
  • D. Procurement
  • E. Inventory Min-Max Planning

Answer: A,B,D

 

NEW QUESTION 26
Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle Manufacturing Cloud.

  • A. Resource calendars of the work centers involved
  • B. The primary work definition of the item
  • C. Plant calendar exceptions
  • D. The shifts are defined in the plant calendar
  • E. The lot size of the item
  • F. Resource calendar exceptions

Answer: B,D,E,F

 

NEW QUESTION 27
The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.

  • A. The Costing Interfaced Attribute is enabled in the resource definition.
  • B. The Manage Item Rules setup is not complete.
  • C. The item was made inactive after the Work Order transaction.
  • D. The Costing Interfaced Attribute is not enabled in the resource definition.

Answer: D

 

NEW QUESTION 28
During a Manufacturing Cloud implementation, the Production Supervisor wants to close thework orders for last month and wants to make sure that the work orders include the correct cost.
Identify the approach to be taken by the Production Supervisor.

  • A. The Production Supervisor should make sure that all costs are included while closing last month's work orders; however, variances can be included after closing the work orders.
  • B. The Production Supervisor needs to include all costs and variances in last month's work orders and close them; however, the work orders where updates are expected, should not be closed.
  • C. Work order costs can be updated anytime regardless of the status of the work order.
  • D. The Production Supervisor need not include cost variances while costing last month's workorders because those can be applied directly in subledger accounting.

Answer: B

 

NEW QUESTION 29
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.

  • A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
  • B. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
  • C. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units inDefault Availability column.
  • D. Click Outsidethe existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.

Answer: D

 

NEW QUESTION 30
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?

  • A. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work ordername> Tap or click the Release action, and click OK
  • B. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
  • C. Select the infotile On Hold> Select awork order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
  • D. Select the infertile Dispatch List> Select awork order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK

Answer: D

 

NEW QUESTION 31
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?

  • A. Production Engineer
  • B. Production Operator
  • C. Manufacturing Engineer
  • D. Manufacturing Supervisor
  • E. Production Supervisor

Answer: C

 

NEW QUESTION 32
The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such away that those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.

  • A. Set up the machines as cost element type of "Resource" by selecting Cost Element set Common.
  • B. Set up the machines as cost element type of "Overhead" by selecting Cost Element set ABC.
  • C. Set up the machines as cost element type of "Resource" by selecting Cost Element set ABC.
  • D. Set up the machines as cost element type of "Overhead" by selecting Cost Element set Common.

Answer: A

 

NEW QUESTION 33
Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)?

  • A. Create and update ATO (Assemble To Order) model work definitions
  • B. Update Work Definitions
  • C. Create Work Definitions
  • D. Populate Descriptive flexfields

Answer: A,D

 

NEW QUESTION 34
Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of productsmanufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally.
Identify two different ways of achieving this requirement.

  • A. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and CorporateEngineering organization as Inventory Organization.
  • B. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Item Organization.
  • C. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Inventory Organization.
  • D. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Item Organization
  • E. Set up Plants as Inventory Organizations, Distribution Centers as Inventory Organizations, and Corporate Engineering organizations as Item Organization.

Answer: D,E

 

NEW QUESTION 35
Your customer has completed the required setup steps for automatic work definition. Identify the option that shows the navigation steps needed to create an automaticwork definition.

  • A. Manufacturing > Work Definition> Manage Standard Operations> Create automatic definition
  • B. Product Management> Product Information Management> Items> Edit Item > Actions> Create automatic work definition
  • C. Manufacturing> Work Definition> Manage Standard Operations> Select default standard operation> Actions> Create automatic work definition
  • D. Manufacturing > Work Definition> Manage Work Definitions> Actions> Create automatic work definition

Answer: C

 

NEW QUESTION 36
As a production supervisor, you require immediate access to critical shop floor execution systems to take actionwhile on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?

  • A. Reviewing operation, component, and resource detail
  • B. Executing standard work order and updating item and resource usage
  • C. Releasing work orders using quick swipe details
  • D. Reviewing customer information of work orders
  • E. Searching for work orders and sending them through e-mail
  • F. Creating a new standard or non standard work order

Answer: A,C,D,E

 

NEW QUESTION 37
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, hasscheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?

  • A. The engineer does not have Data access to Items.
  • B. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.
  • C. The engineer does not have Dataaccess to Item Structures.
  • D. The engineer does not have the Manage Work Definitions function privilege.
  • E. The engineer does not have Data access to Items Attributes.

Answer: B,D

 

NEW QUESTION 38
As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

  • A. The Manufacturing Master Data Functional Area
  • B. The Manage product and Child Value Sets task
  • C. The Supply Chain Orchestration Functional Area
  • D. The Manage Items Profile Options tasks

Answer: A

 

NEW QUESTION 39
A user wants to transfer the work order status updates and resource transaction data for costed resources to Cost Management.
Whichscheduled process should you run to achieve this requirement?

  • A. Transfer Transactions to Costing
  • B. Transfer Cost to Cost Management
  • C. Transfer General Ledger Balances to Balance Cubes
  • D. Transfer Ledger Balances

Answer: B

 

NEW QUESTION 40
A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its existing Work Definitions. After copying from the existing Work DefinitionWD1 to the alternative Work Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing process WD2.
Identify the reason.

  • A. The Production Priority was not populated in the new Work Definition WD2 duringcreation.
  • B. The Item and Structure Name in the existing Work Definition WD1 were retained in the new Work Definition WD2 as well during creation.
  • C. The Item and Structure Name were changed in the new Work Definition WD2 during creation.
  • D. The StartData was not populated in the new Work Definition WD2 during creation.

Answer: D

 

NEW QUESTION 41
Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the MorningShift and the remaining units are available for the Evening Shits.
Which two actions must you perform to associate LATHE with W1?

  • A. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column.
  • B. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.
  • C. Select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.
  • D. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 40% against the resource LATHE in the Evening Shift column.
  • E. Select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column.
  • F. Do not select the Available24 Hours check box and in the Resource Availability region, enter 60% against the resource LATHE in the Morning Shift column.

Answer: E,F

 

NEW QUESTION 42
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.

  • A. Update Firm flag in the Details region of the Edit Work Definition page.
  • B. Update Supply Plan Options, Overwrite Firm Planned Orders = None.
  • C. Update Firm flag in the Details region of the Edit Work Order page.
  • D. Update Firm flag in the Details region of the Edit Work Definition Names page.

Answer: B,C

 

NEW QUESTION 43
A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.

  • A. Reverse material issued to a work order.
  • B. Reverse from scrap to ready.
  • C. Reverse the product at the last operation.
  • D. Reverse at an operation.
  • E. Reverse from reject to ready.
  • F. Reverse resources charged to a work order.

Answer: A,B,E,F

 

NEW QUESTION 44
Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.

  • A. Costing Priority
  • B. Add an Operation
  • C. Production Priority
  • D. Completion Subinventory
  • E. Delete an Operation

Answer: B,C,D

 

NEW QUESTION 45
......

Latest 1z0-1075-22 Pass Guaranteed Exam Dumps with Accurate & Updated Questions: https://www.testpassking.com/1z0-1075-22-exam-testking-pass.html

1z0-1075-22 Exam Brain Dumps - Study Notes and Theory: https://drive.google.com/open?id=1-BeybbnY6p69t6WzCgm4kE4RmkferjiY